Rehabilitation and development of the shaft and excavation of connected mine chambers
BGE (Bundesgesellschaft für Endlagerung mbH)
ARGE Schacht Konrad 2 (ASK2)
Salzgitter, Germany
2010
until approx. 2028
Project objective
Shaft Konrad 2 is being prepared for the final repository for radioactive waste with negligible heat generation. The work is being carried out in the former Konrad iron ore mine in Salzgitter. The aim is to refurbish the shaft and excavate adjacent mine workings.










Driveway from:
Other commissioned services:
Zweigeteilte Ausführung mit Kalotte und Sohle
| FOE | FOE/ETS | ETS | |
| Length (m) | 35 | 20 | 40 |
| Width (m) | 11 | 20 | 9 |
| Height (m) | 9 | 9 | 8 |
| Breakout cross-section (m²) | ≥ 80 | ≥ 80 | ≥ 70 |
Expansion: